ENHE

Our Projects

Commercial solar system | 289 kW | Nir Galim school

City

Nir Galim

Capacity in kW

289

An in-house Rotem Energy crew installed a commercial solar system on a school in Nir Galim, making the fullest possible use of the building's roof to generate the maximum return from solar energy. The company guided and managed the process for the client from the permit stage through to grid connection. The client benefits from monitoring and fault handling by Rotem Energy as part of the two-year warranty that runs from the day the solar system was built.

Get in touch

and start earning today with solar energy!

Rotem Energy projects

Our Projects

Every month your roof stands empty is money you are not earning

Leave your details and we will call you back, or call *8426 now
Do you have a regularized farmstead?

For the first time in Israel, enjoy a fixed income and a high return

A solar system suited to one dunam in plot A, with an emphasis on dual use of the land

for 25 years
Get in touch